Stage 01 — Groundwork
Level Zero
Poured level, cured hard — everything above depends on it.
Stage 02 — Structure
The Frame
The timber frame rises in days, plumbed at every corner.
Stage 03 — Envelope
Weather-Tight
Cladding, roof and wrap — the rain can do what it likes.
Stage 04 — Interior
The Finish
Windows set plumb, doors hung true — the last millimetres.
Stage 05 — Handover
Lights On
Keys handed over, every window warm — a decade guaranteed.
Level at the slab. True at the ridge.



